The PSUR calendar builder
A compliant Art. 108 schedule from your real MA grant dates.
Article 108 rewrites the PSUR frequency schedule. Annual, 3-yearly, and 5-yearly cycles shift — and your entire portfolio's reporting ladder needs rebuilding before 2028.
A portfolio with products authorised across different years will run annual, 3-yearly, and 5-yearly PSUR cycles at the same time.
3
Reporting tiers in the new schedule: annual, 3-yearly, and 5-yearly
11yr
Threshold where 5-yearly reporting begins — up from the old single 5-year trigger
~60%
Of mature portfolios have products over 5 years needing recalculation
Article 108 introduces a three-tier frequency ladder replacing the old two-tier model.
We were told to update our PSUR calendar for the new three-tier schedule. Our current calendar is in Excel and no one built it from the actual MA grant dates.
Here's the obligation delta for PSUR schedule. The new EU Pharmaceutical Directive replaces Directive 2001/83/EC[1][2] — below is what changes, row by row.
2 tiers: annual (0–5yr) then 3-yearly thereafter.
EURD listings inconsistently applied across portfolios.
EURD-listed products follow EURD regardless of product age. Art. 108 applies to non-EURD only.[5]
Products already on 3-yearly cycle under old framework.
Products 5–11yr stay on 3-yearly; products over 11yr move to 5-yearly. Dates recalculated from MA grant.[6]
Synthesised from 20 citations across 256 regulatory sources.
Book a 15-minute live walkthrough of the Workbench
Most PSUR calendars were set up once and never revisited. The new schedule changes the logic of how maturity is calculated.
Static calendars
Built on old MA dates
EURD vs non-EURD mixing
One tracker for both
A compliant Art. 108 schedule from your real MA grant dates.
From portfolio audit to submission tracking — built for the Art. 108 three-tier schedule.
Pulls grant dates, authorisation type, and EURD status for every product. Classifies each by current Art. 108 tier and flags products where transition triggers a frequency change.
With renewals abolished under Art. 46, regulators rely on PSURs more heavily. Getting the schedule wrong is no longer a minor lapse.
Art.46
Missed PSURs linked to continuous compliance — MA suspension risk without renewal as safety valve
3×
Scheduling logics running simultaneously in mature portfolios: annual, 3-yearly, and 5-yearly
2028
Transition requires recalculation from MA grant date — not just rolling forward existing dates
“We had 47 products on PSUR schedules built before 2020. Rebuilding for Art. 108 wasn't just date recalculation — 12 products needed a completely different submission frequency.”
Recalculate submission dates across your entire portfolio — with EURD override logic, tier detection, and PASS/PAES linkage.
Art. 108 Calendar Builder recalculates due dates with tier boundaries and EURD overrides.
Start calendar rebuild30-minute session identifying products transitioning between tiers at implementation.
Book PSUR audit